DAK Part 2

Status
Not open for further replies.

rtfoe

SMF Supporter
Joined
Apr 29, 2018
Messages
7,465
Points
113
Location
Malaysia
First Name
Richard
Golly Gee Daniel...you're even faster than Peter D. :smiling6: Thank goodness you're on hols...gives me time to catch up. The beaches in Sri Lanka are beautiful with fantastic rolling surf. That last picture looks just like my back yard...just kidding, nearby maybe. :smiling4: Enjoy and have a great time.

Cheers,
Richard
 
D

Daniel Horvath

Guest
John and Richard thanks for the good wishes! Vacation is great no complaints! Feel super lucky to had a chance to explore this country and the trip is not even close to the end ! Take care fellas! Happy modelling! Back at it in December! All the best regards Danny from Sri Lanka!
 
D

Daniel Horvath

Guest
Good morning fellow modellers! Im back from vacation! There is no time to waste so im back in business. While i was away the postman dropped of some kits for the project. So the next step is the construction of the wall for the military base and the gate or entrance ,For this i will use miniart village workshop because it will match the house I have constructed before. I will need at least 6 kit to create a length of 175cm . For the gate or entrance i will use From MTH a double tunnel portal , because I couldn’t find anything better which would fit the size i need ! So here are they8C0FF85A-F4FC-4765-88E4-367831683D12.jpeg08D90816-92B8-42F0-9A46-513CEC7A2732.jpeg
 
D

Daniel Horvath

Guest
However the tunnel portal was a little bit too tall so I need it to adjust and cut the legs down 2FADADB9-DF1E-410E-906B-EB3720C686D7.jpeg
 
Last edited by a moderator:
D

Daniel Horvath

Guest
Also the other side of the tunnel was hollow! Luckily the kit comes with 2 pieces. So again need it some adjustments! I cut down the outer edges so i left with a flat panel which will be attached to the the back of the tunnel! 9EE7798F-14C5-4C0C-A030-66B5EA98185F.jpeg406BFD0F-909C-4F5C-A7EF-9E4622869769.jpegA3EBC005-78B0-4F65-9B67-2CD1387A2AE7.jpeg4EDD9EC1-220F-4DDA-9CFE-E7878B11DB0E.jpeg
 
D

Daniel Horvath

Guest
From the miniart wall i will only use the wall section without roof and like I said i will need 6 kit 3 on either side of the entrance! Sofar i only bought 3 kits . The construction is done next step is to fill up the gaps and attach them together and after it’s ready for painting ! 2163AC9C-1187-418A-8CE2-F7709239B51A.jpeg
 

JR

Member of the Rabble and Pyromania Consultant
SMF Supporter
Joined
May 26, 2015
Messages
17,215
Points
113
Location
lincs
First Name
John
Welcome back Danny.
Nothing like going for it in a big way ! Like the modification of the bridge front. Surprised you've not taken up casting resin whilst on holilday.:smiling: with that number to do .
Just how big is this going to be ?
John.
 

scottie3158

SMF Supporter
Joined
Apr 27, 2018
Messages
12,525
Points
113
Location
Spalding
First Name
Paul
Danny,

My apologies mate I have no idea how I missed this. just had a catch up from the beginning. You don't believe in doing things by halves lol. Great work so far, will be watching out for this.
 

rtfoe

SMF Supporter
Joined
Apr 29, 2018
Messages
7,465
Points
113
Location
Malaysia
First Name
Richard
Hey Daniel, you're back and totally stuffed with Devil Curry I presume. Already cutting things down to size I see. Will be watching progress.

Cheers,
Richard
 
D

Daniel Horvath

Guest
Hey guys! John, Paul, Scottie and Richard thanks for joining fellas!

So john the size of the dio will be the same as the 1st part 100cm x 175cm ! Will be a biggy again and it’s just part 2 !!! Will be a part 3 as well at some point!

Richard was loads of curry you absolutely right however im not fan of it so sticked with a more european cousine

Scottie you know me mister nothing by halves ! Unfortunately I allways think big guess at some point will need a bigger house ehehe!

Paul thanks joining the build it will take a while to complete for sure last one took 14 months, I hope this one get done quicker!

Stay tuned fellas loads more to come! Best regards Danny
 
D

Daniel Horvath

Guest
So you guys have an idea about my plan here is how it will be ! Well many more months to come and also lot of work need to be completed until it’s done but slowly pieces are getting in place!0F0BD1D3-EB65-42E4-8783-00CCD0AB599A.jpeg5646FE28-0470-425C-91F5-C4AF87A9E1D0.jpeg Cheers Danny
 

Steve Jones

Steve Jones Scale Modelling Site
Joined
Apr 27, 2018
Messages
6,698
Points
113
Location
Plymouth
First Name
Steve
Welcome back Dan. I hope you had a nice break. Looking forward to watching your next instalment of DAK come together over the coming months. Good luck:thumb2:
 
D

Daniel Horvath

Guest
Hi Steve it’s good to be back ! missed modelling however didn’t missed the cold winter at all!

So today’s update I have painted the stones with different colours little bit of weathering and also gived a wash as well! Next up is the entrance gate but my airbrush gived up working so have to wait for the new to arrive before I can continue! So here is the completed wall section! Thanks for looking Cheers Danny 7EF0E471-66D6-48FD-8A99-D3B6E23FC6C2.jpeg
 
D

Daniel Horvath

Guest
Good evening guys! Today I managed to complete the gate or entrance, I tought we need some Nazi emblem in the middle and after a search on the net came across this one... so the gate is done emblem is in place so im on to the next part of the build! Next updates soon! Thanks for looking Cheers Danny 09A54E80-E82F-48B4-8980-F4502E553C17.jpegBFB33182-E7F7-4E01-86B6-4624B6724A62.jpeg81D7E28E-A273-408E-A9DF-FD956C0A69A5.jpeg
 

JR

Member of the Rabble and Pyromania Consultant
SMF Supporter
Joined
May 26, 2015
Messages
17,215
Points
113
Location
lincs
First Name
John
Top marks on the painting the arch way, no doubt you will be doing some washes later on.Think the Eagle is a great choice:thumb2:
John.
 
Status
Not open for further replies.
Top