Oakleaf Shipping & Storage Building.

Polux

GB Mod.
Moderator
Joined
Jul 10, 2011
Messages
10,022
Likes
4,204
Points
113
Location
Catalonia
First Name
Polux
#63
After different attempts, I will leave the color as is done....
So it’s time to start with the vegetation!!

8A19BA1C-8914-4669-9C4D-5E6E76AA31E8.jpeg

D2901BED-9A0F-4AE8-855C-3E0974D14452.jpeg

C6DC9AF6-CD17-4E06-950D-72EC34B66354.jpeg

6C1E954E-EAE3-4827-B82B-15620C0C0649.jpeg

8173418B-8A23-4AC0-9AC4-FFE7EDC4640D.jpeg

E89E85D6-97C4-4B2F-95B9-5B77AE7E1895.jpeg

07745AF0-8014-46A3-853C-0F9AD4172780.jpeg

Remains some work to do yet, like the tree, add some matt varnish, the rails, the van and some final details once glued the structure....but i’m there.
I wishing to finish it and start a new project :thinking::thinking::thinking:

Thanks for looking!
 

Polux

GB Mod.
Moderator
Joined
Jul 10, 2011
Messages
10,022
Likes
4,204
Points
113
Location
Catalonia
First Name
Polux
#67
I decided to add some new items....
As my business is related on the bee world, I’ve been building some hives.
Are so small!!!!!!

(Need to paint yet.)

030D1462-2810-4BD2-92D9-1962FAEB174E.jpeg
 

Steve O

SMF Poster
Joined
Dec 24, 2017
Messages
326
Likes
168
Points
43
Location
Staffs.
First Name
Steve
#68
What a superb build Polux i can see a lot of hard work has gone into this build and you've nailed it, well done.

Steve.
 

Polux

GB Mod.
Moderator
Joined
Jul 10, 2011
Messages
10,022
Likes
4,204
Points
113
Location
Catalonia
First Name
Polux
#70
Yep!!!
After finished the tree, the van and some minor issues, I can call this one done!!!!

Thanks everyone for your help and comments :smiling:

I will open a new post as soon as I have the pictures lol

CFE11BFA-25A7-491F-874C-5FF0BD8515F4.jpeg
Adding a pin wash.... (see the difference)
 
Top