Some very slow progress.
Lava river has been poured but did not work uit as expected. I should have used pigment nstead of ink. I will have to come up with a fix for it. Probalby removing supporting plastic sheet underneath to get more even ilumination and some surface work. Maybe getting it matt instead of glossy or painting with thin layer of pigmented epoxy. Not sure yet.
Next in line are bridge base rock blending, drawbridge, Tower's top and first floor flooring, bridge and gate tunnel surfacing.
Tower windows seem out of scale but I couldn't have smaller ones (I tried ones in arch like shape) as the lizard needs to be able to pass through.
Lava river has been poured but did not work uit as expected. I should have used pigment nstead of ink. I will have to come up with a fix for it. Probalby removing supporting plastic sheet underneath to get more even ilumination and some surface work. Maybe getting it matt instead of glossy or painting with thin layer of pigmented epoxy. Not sure yet.
Next in line are bridge base rock blending, drawbridge, Tower's top and first floor flooring, bridge and gate tunnel surfacing.
Tower windows seem out of scale but I couldn't have smaller ones (I tried ones in arch like shape) as the lizard needs to be able to pass through.