Posting a little early this week as SHMBO has reminded me it's Christmas, and my annual visit/pilgramage to the shops is scheduled for tomorrow, so I am told.
This week I have been concentrating on the Masts, which has been enhanced with P.E. Yardarms. Each Yardarm has two eyelets on top which are a little undersized, so have drilled these out to 0.3mm dia., checked also that all the other holes were 0.3mm, as gluing the doublers was a messy business. I put a spot of CA Gel at each end of each doubler, when secure I used the ZAP thin CA Glue's capillary action for the final bond between surfaces. I assembled the Tripod section of the mast in-situ, in order to make sure the feet were correctly positioned.
View attachment 93680
View attachment 93681
View attachment 93682
View attachment 93683
I found a good photo of the Bow of KGV which shows the bollards for the Paravane chains: as the kit provided spare small bollards, I used two and split them in half and rotated one half so the 'horns' were pointing fwd. as the KGV photo below.
Made up a few other bits and pieces, not worth photographing.
View attachment 93684
View attachment 93685
View attachment 93686
This ends the manufacture of the main components. I am now going to go over all of the superstructure, tidying it up, checking fits, adding portholes and handrails etc. so my next posting will be when this is finished.
I will then do the same to the Hull/Deck, which needs tidying up; portholes added and I am going to risk fitting the deck handrails before fitting the wooden deck so that I can make the paint job as tidy as possible around the deck handrails, a bit of a gamble I know. Derek